Start receiving requests for connection of photovoltaic systems by self producers with energy offsetting (net metering) to the low voltage grid 03/27/2015.
Pursuant to the provisions of the Ministerial Decision APEIL/A/F1 /, oik 24461 (FEK 3583/31.12.2014) concerning the photovoltaic systems from self producers with energy offsetting (net metering), the DEDDHE the attention of stakeholders that socket on connection requests will start on 05.08.2015.
Initially the DEDDHE will welcome only connection requests from consumers supplied by the low voltage network for maximum power 100 kWp photovoltaic system on the mainland and islands interconnected with it [1], 50 kWp in Crete 20 kWp in other non-interconnected islands. Requests will be submitted to the competent local units of DEDDHE (Areas) by completing the relevant Application Form and of joining the stipulated documentation and data. Announced by the DEDDHE will determine the date and the slots of the connection requests from consumers supplied by the medium voltage network after solving the most complex technical issues related to these connections. Within the next few days will be posted on the website of DEDDHE relevant documents (Factsheet, Frequently Questions-Answers, Model Connection Agreement, Registrations Models etc.).
[1] In particular Peloponnese in the south part of Evia Aliveri and to the islands of Andros and Tinos currently be accepted requests with maximum output of 20 kWp.